From Prototype to Production: A Checklist

Moving from one prototype to a production run is where most cost is locked in. A short checklist keeps it disciplined.

May 22, 2026 5 min read
From Prototype to Production: A Checklist

Moving from one prototype to a production run is where most cost is locked in. A short checklist keeps it disciplined and prevents expensive surprises.

Before you commit to volume

  • Has the design passed a DFM review for the chosen process?
  • Are tolerances driven by function, not habit?
  • Is part count minimized (DFA)?
  • Are materials and fasteners standardized?
  • Is there a test plan for the first batch?
  • Is there a jig/fixture plan for repeatable assembly?

A two-hour review at this stage saves weeks and thousands later. That is the real work KED does — not just designing parts, but designing the path to making them.